Subscribe to Our eNewsletter

  • Home
  • About Posi-Shell
  • Equipment
    • Hydroseeding Units
    • PSA 2000
    • PSA 3500
    • HS 50T Silo
  • Materials
  • Applications
    • Ash Cover
    • Bale FIll Cover
    • Cement Clinker Pile Cover
    • Coal Pile Cover
    • Compost Pile Cover
    • Contamination Containment
    • Dust Control
    • Erosion Control
    • Hazardous & Nuclear Waste Containment
    • Landfill Daily Cover
    • Landfill Intermediate Cover
    • Landfill Mining & Reclamation
    • Mine Tailings Cover
    • Odor Control
    • Rail Car Cover
    • Sludge Lagoon Cover
    • Specialty Hydroseeding
    • Temporary Ditch Lining & Drainage
    • VOC Suppressions
  • Product Specs
  • History
  • Case Studies
    • Disaster Clean Up
    • Dust Control
    • Fly Ash Cover
    • Hazardous Waste Landfill
    • Hydroseeding
    • Industrial Process Waste
    • Low Level Nuclear Waste
    • Mine Tailings Cover
    • Waste Cover
  • FAQ
  • Visit Posi-Shell Blog
  • Contact Us

News

Cement Clinker Pile Cover

A special Posi-Shell® formulation, using a low permeability mixture, has been successfully applied at numerous outdoor cement clinker storage piles for protective coating to eliminate rainwater infiltration. Protection of these piles with the Posi-Shell® Cover has resulted in large savings for the cement producers.